Riverside Home Renovation Project ~ Update 8

Progress continues to be made at The Riverside Home Renovation Project in Lisbon NH

It has been a couple of weeks since my last update on The Riverside Home Renovation Project and the crew at Spooner’s Home Improvement Services have been hard at work!

In this update you will see the changes taking place to the bedrooms and the 2nd bathroom.

The other bathroom

In today’s world everyone wants more than one bathroom especially when the bedrooms are on the 2nd floor. As you will see in the photo below this bathroom had some design flaws, the mirror over the vanity actually closed over the window, the tub was placed under the eave leaving little head room.

clip_image001

The crew at Spooner’s Home Improvement Services has added a dormer to open up the roof line and will be replacing the tub with a shower. They have also sealed the window to open the far wall for the placement of the shower and are moving the vanity to the wall on the right next to the toilet.  The photo below shows how adding the dormer opened up the wall where the tub was adding head room.  I will bring you more as this room continues to progress.

clip_image002

The Bedrooms

This home has 3- bedrooms all of which had the old plaster & lathe and wood paneling on the walls; the paint was peeling and the plaster cracked or falling.

The Master Bedroom

The plaster has been removed and sheet rock hung and painted, the old windows have been replaced with new energy rated vinyl replacement windows, the closet was opened up and new doors installed.  Below left before renovations started, on the right after sheetrock hung before windows replaced.

clip_image003 clip_image004

Below left you can see how the closet was opened up, on the right you’ll see the windows have been framed in and the walls have been painted.

clip_image005 clip_image006

The 2nd Bedroom

The 2nd Bedroom had wood paneling on the walls over the old plaster & Lathe. The paneling has been removed along with the old plaster and new sheetrock has been hung.

clip_image007 clip_image008

The 3rd Bedroom

The 3rd Bedroom had paint peeling away from the old plaster and there were cracks in the walls. Below you will see the how the room has progressed, like the other bedrooms the plaster was removed and new sheet rock has been hung. The windows have been replaced and the walls and ceiling have been painted.

clip_image009 clip_image010

This concludes my update for this week as always I look forward to any comments, suggestions and feedback.

If you or someone you know is considering purchasing a home in Lisbon NH and would like to consider this home as a possibility please don’t hesitate to contact me!

If you’d like to receive updates in your email simply click on ‘subscribe’ at the top of the page

Leave a Reply

Your email address will not be published. Required fields are marked *